Reclamation of existing track, subbase, asphalt paving, fence, triple jump, long jump, discus & shot put pad, track surfacing.
Project Highlights
Fast pace construction schedule, Track fine grading and tolerances, Over 1,000 ton of asphalt installed with CRAFCO surface coating

